chs 381 Published Thursday, September 26, 2024 - 9:30 am at 1252 × 1428 in With G humming on Madison, SDOT completes work on Route 48 Transit-Plus Multimodal Corridor Project, the 23rd Ave RapidRide route that never was (Image: SDOT) Share this:TweetPrintEmail